TASK
Create an impermeable barrier in the soil using jet grouting technology at a hydraulic structure.
TECHNOLOGY
Jet grouting of soil.
MATERIAL
Mineral composition PolyJET 01.
DESCRIPTION
The project required the construction of a cutoff wall under complex hydrogeological conditions. The work was carried out using the stabilized mineral composition PolyJET 01.
RESULT
A fully functional hydraulic structure with a successfully implemented design solution.