The first action may be to repair a leaking service, improve drainage, change an operating load or stabilise an excavation. A treatment that addresses only the visible consequence may not control the process that caused it.
After active causes have been addressed, engineers compare the treatment depth, reachable zone, soil response, structural condition, access, permitted movement and method of verification. Options can include
ground improvement, controlled void filling, slab re-levelling, excavation and replacement, underpinning or another foundation solution.
Condition — Possible approach — Key limitation — Typical verification
Loose or variable material within a reachable treatment zone — Injection treatment, compaction or another ground-improvement method — Response depends on soil structure, water and treatment geometry — Installation records, monitoring and suitable before-and-after testing
Confirmed void beneath a slab or foundation — Controlled void filling — The source of material loss must be corrected; filling does not automatically strengthen surrounding soil — Volume records, level monitoring and confirmation of support where practicable
Settled slab that remains suitable for controlled movement — Slab re-levelling with support restoration — Joints, services, adjacent structures and permissible movement may limit lifting — Precise level monitoring and post-treatment survey
Deep compressible layer or load-transfer requirement — Underpinning, deep foundations or a combined system — Greater construction intervention and structural design are normally required — Design calculations, installation records and performance monitoring
Shallow unsuitable fill with open access — Excavation and replacement — Disruption, disposal, groundwater and access constraints — Density or other specified acceptance tests
The table is a decision aid, not a design. A
foundation settlement solution should be selected against the project loads, structural tolerances and verified site conditions.